X
Search

Indorama will not be responsible for applications submitted on any website other than its official website at http://nigeriaweb.ibees.in/

Indorama does not charge any fees for the submission of job applications.

aboutus banner
OIPL

OIS Indorama Port Limited (OIPL) is a joint venture between Oil & Industrial Services (OIS) and Indorama Eleme Petrochemicals (IEPL), established on April 19, 2013. OIPL built its own multi-purpose port terminal at Onne Port, Rivers State, Nigeria, to be self-reliant for urea exports from Indorama Eleme Fertilizer & Chemicals Limited (IEFCL). 

chairman msg

The OIPL Port Terminal is a dedicated 24/7 facility for worldwide urea exports. Urea is produced by IEFCL at its Port Harcourt plant and transported to the port warehouse in dedicated IEFCL-owned bulk trucks through an integrated supply chain management system. The facility follows best international practices, ensuring temperature and humidity control at all stages to maintain fertilizer quality.  

By July 2025, OIS Indorama Port Ltd had handled a total of 297 vessels. The company continues to expand urea exports to new regions and countries, including Europe (France, Italy, Poland), North America (USA, Canada, Mexico), South America (Brazil, Argentina, Colombia), Asia (India), and West & East Africa.

chairman msg

The OIPL Port Terminal is an added value to our overall system as it ensures:

The material is moved from Plant to Port in covered trucks and with temperature and humidity control at the Port, the Urea quality is maintained.

The OIPL port is 18Km away from the Plant, ensuring delivery at the port in less than 3 hours. With the state-of-the-art automation and loading equipment at the port, OIPL delivers faster turnaround of vessels, bringing a competitive advantage in terms of cost.

Infrastructure
Infrastructure
The OIPL Port Terminal is an operational and quality-driven asset that strengthens Indorama’s global fertilizer supply chain. 
Urea Bulk Warehouse
Urea Bulk Warehouse

76,000 MT storage capacity to ensure product safety.

Loading Facilities
Loading Facilities

Two loading arms, each with a capacity of 900 MT/hr, for rapid vessel turnaround.

Quay Deck
Quay Deck

295m in length, providing 320m waterfront availability for vessels up to 68,000 DWT. 

Strategic Proximity
Strategic Proximity

Located 18 km from the IEFCL plant, ensuring delivery to the port in less than 3 hours. 

Reliable Supply Chain
Reliable Supply Chain

Integrated logistics for smooth operations.

Power and Utilities
Power and Utilities

A dual-fuel engine (Diesel/Gas) with 3.5 MW capacity for uninterrupted operations.